TimeLine2006: Difference between revisions

Jump to navigation Jump to search
Line 79: Line 79:
11th - EGM is held to elect the third admin position. Werdz, Abolo and Igy pass the test and run for the position. Igy was elected.
11th - EGM is held to elect the third admin position. Werdz, Abolo and Igy pass the test and run for the position. Igy was elected.


23rd - The new dell rack is installed in the server room and tolka is moved out - [http://gallery.redbrick.dcu.ie/phaxx/redbrickrackreplace/ gallery.redbrick.dcu.ie/phaxx/redbrickrackreplace/]
23rd - The new dell rack is installed in the server room and [[tolka]] is moved out - [http://gallery.redbrick.dcu.ie/phaxx/redbrickrackreplace/ gallery.redbrick.dcu.ie/phaxx/redbrickrackreplace/]

Navigation menu