RBOnly:Minutes 2002 10 04: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 2: | Line 2: | ||
Present: | Present: | ||
*Andrew, Nikki, Carla, David, Eoin, Shane, Mark C, Declan, Cillian, Dermot | |||
Absent (with reasons): | Absent (with reasons): | ||
*Mark D | |||
==C&S Day== | |||
*Plans for C&S day were discussed | |||
*The tables and the number needed was talked of. The gophers list was suggested as a potential source of helpers on the day. | |||
*As well, the number of t-shirts left is needed counting. The gophers will probably want some for the day too. | |||
*The magreaders are working fine according to Cillian. He needs a cheque for their purchase. | |||
*There was an idea to use the blue backing boards from last year. This will be looked into. | |||
*The second banner still needs picking up from the buildings office. Amazing but true. | |||
==The Room== | |||
*There has been some pestering from SPC/SU about removing RB from the C&S offices. | |||
*CSD have offered to take our racks when we have no more use for them. | |||
*The disposing of our unwanted material was discussed. A skip is the likely, if only solution. We need special arrangements to dispose of the batteries. | |||
*If subsequent quotes are requested from the contractors, it's suspected that the quote might go up, ie, the revised quotes for the air con, moving the door, knocking the wall etc. | |||
*The air-con; where is it going? Roof or wall? Does it need to go through the second room etc? | |||
==WebBrick== | |||
*It should be ready and up and running soon. Should require stress testing first of all though. | |||
*The new site design/set-up was discussed. | |||
==Grant Form / Finances== | |||
*DO we have any new assets since last year? Is there any insurance needed for anything? Apparently the SPC owns everything. | |||
*A new cheque book needs ordering. | |||
==Helpdesk== | |||
*We need to publish the dates of the first tutorial. The room for the year needs to be booked - probably the CA building again. | |||
==Ents== | |||
*The event is to be a free event on the 16th October. | |||
*Update on the Paddy Casey situation should come soon - we're not sure if he can play. | |||
*The tickets can be handed out in the canteen (though can this be done), and/or the Hub | |||
==AOB== | |||
*Minutes: Make the minutes available on the web? | |||
*Moderating cmte board? | |||
[[Category:Minutes]] | [[Category:Minutes]] |
Latest revision as of 12:53, 19 June 2008
Minutes of Meeting, 07th October 2002.
Present:
- Andrew, Nikki, Carla, David, Eoin, Shane, Mark C, Declan, Cillian, Dermot
Absent (with reasons):
- Mark D
C&S Day
- Plans for C&S day were discussed
- The tables and the number needed was talked of. The gophers list was suggested as a potential source of helpers on the day.
- As well, the number of t-shirts left is needed counting. The gophers will probably want some for the day too.
- The magreaders are working fine according to Cillian. He needs a cheque for their purchase.
- There was an idea to use the blue backing boards from last year. This will be looked into.
- The second banner still needs picking up from the buildings office. Amazing but true.
The Room
- There has been some pestering from SPC/SU about removing RB from the C&S offices.
- CSD have offered to take our racks when we have no more use for them.
- The disposing of our unwanted material was discussed. A skip is the likely, if only solution. We need special arrangements to dispose of the batteries.
- If subsequent quotes are requested from the contractors, it's suspected that the quote might go up, ie, the revised quotes for the air con, moving the door, knocking the wall etc.
- The air-con; where is it going? Roof or wall? Does it need to go through the second room etc?
WebBrick
- It should be ready and up and running soon. Should require stress testing first of all though.
- The new site design/set-up was discussed.
Grant Form / Finances
- DO we have any new assets since last year? Is there any insurance needed for anything? Apparently the SPC owns everything.
- A new cheque book needs ordering.
Helpdesk
- We need to publish the dates of the first tutorial. The room for the year needs to be booked - probably the CA building again.
Ents
- The event is to be a free event on the 16th October.
- Update on the Paddy Casey situation should come soon - we're not sure if he can play.
- The tickets can be handed out in the canteen (though can this be done), and/or the Hub
AOB
- Minutes: Make the minutes available on the web?
- Moderating cmte board?